RECONSTRUCTION 1.62KM OF ASPHALTIC CONCRETE AT LEICESTER PEAK & REHABILITATION OF 1.4KM GRAVEL ROAD.Sep 29, 20220 min readFINAL SPN FOR WORKS.pdfDownload PDF • 123KB
Hiring an individual consultant to support the preparation of a Local Developments Grants sub-projects’ Operation and Maintenance (O&M) Manual (AGBSDP)
Hiring a consulting firm to support devolution function (unbundling ofdevolved functions) with an implementation plan.
RECRUITMENT FOR THE POSITION OF AN INTERNAL AUDIT SPECIALIST FOR THE RESILIENT URBAN SIERRA LEONE PROJECT
Comments